@kdfrawg yep. The power poles went up a couple of days before Thanksgiving and the well should be drilled sometime this upcoming week.

@kdfrawg 11.1.1 and 11.1.2 were really buggy for me. Lots of lag and app crashes on launch.

/

There is a possibility for framing to start late this week, but definitely on track for the week of the 11th. The cement for the garage and porches was poured this week. Progress. #nt ImageImage

@kdfrawg it takes me a while to get used to it.

@kdfrawg 11.2 has made my 6s run smoother. I installed it on my iPad Mini 2 as well. I installed them all this morning before I left for work, luckily I had time at home and didn’t have to use crappy hotel WiFi

/

Howdy all. Things have been crazy busy so I haven't had time to check in. The concrete for the foundation was poured yesterday, and the builder said 1.5-2 weeks for it to harden before we start framing.

60fc5805-4918-42e8-8269-2e107851105d

14fdfbeb-6090-4f8a-affc-4e53f5d04924

dd61d9dc-e7f0-4efc-9f8e-c59d7ae54ed8

264bc7fa-45ea-4aa4-a98b-083e14d921c4

More progress on the House. Drain lines should go in next week and possibly pouring the concrete as well. #nt

59a4c18a-ee17-4f60-a085-57fe6367316e

a29557fe-97a0-4291-8087-b37b76004580

2a97c7af-3adb-4381-8dfb-52aff2128dba

@kdfrawg nice. I’m hoping the same is true for me.

That’s the plan. We did some clean up there and the kids had fun running around. Once my daughter saw the foundation, she asked where her room was going to be and then my 4 yr old son started asking where his room is. @kdfrawg